Thornton Minor Residential Subdivision , TPM 20707, Log. No. 02-08-065

3 Documents in Project

Summary

SCH Number
2003111119
Lead Agency
San Diego County
Document Title
Thornton Minor Residential Subdivision , TPM 20707, Log. No. 02-08-065
Document Type
NOD - Notice of Determination
Received
Posted
3/10/2004
Present Land Use
The proposed project is subject to the Regional Land Use Element Policy 1.5 County Town (CT) and General Plan Land Use Designation (2) Residential. The General Plan requires minimum gross parcel sizes of 1 acre and not more than one (1) dwelling unit per acre.
Document Description
The project proposes a minor subdivision of 4.19 net acres into three parcels ranging in size from 1.21 to 1.49 net acres, with a 1-acre minimun lot size for three residential building sites. All lots are currently vacant and have approved leach fields for septic systems. All lots will be on water services provided by the Valley Center Municipal Water District. Grading for the project will consist of 800 cubic yards of cut, 3,584 cubic yards of fill, and 2,784 cubic yards of import. Access to the project site is from Pleasant Knoll Lane, an existing 40-foot wide road easement from Fruitvale Road.

Contact Information

Name
Emery McCaffery
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Pleasant Knoll Road and Rancho Copa
Parcel #
188 240 71
Township
7W
Section
T11S
Other Location Info
Nearest: Valley Center
Other Information
Range: San Bernardino Meridian

Notice of Determination

Approving Agency
Director of Planning and Land Use
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print