Aliso Street Sector A East Parcel Site Remediation Project

2 Documents in Project

Summary

SCH Number
2003111087
Lead Agency
California Department of Toxic Substances Control (DTSC)
Document Title
Aliso Street Sector A East Parcel Site Remediation Project
Document Type
NOD - Notice of Determination
Received
Posted
1/26/2004
Present Land Use
Paved lot, under the elevated El Monte Busway, currently used by the LAPD for temporary storage of vehicles
Document Description
The project involves removal of contaminated soils at the Aliso Street Sector A East Parcel Site. The removal action measures for the project involve the excavation, removal, and transportation of polycyclic aromatic hydrocarbon (PAH), benzene, and naphthalene contamined soils that are above the cleanup/removal goals up to a maximum depth of 12 feet bgs, and treatment of the contamined soil at an offsite thermal treatment facility. The proposed removal of contamined soil will be conducted in accordance with the methods and procedures presented in the document entitled "Removal Action Workplan (RAW)".

Contact Information

Name
Stephen Cutts
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Ramirez and Center
Zip
90012
Total Acres
0.7
State Highways
101, 5, 10, 110
Railways
Southern Pacific, Union Pacific
Schools
Utah Street School
Waterways
Los Angeles River
Range
13W
Base
SanBern

Notice of Determination

Approving Agency
Department of Toxic Substance Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print