Mitigated Negative Declaration for the Cross Connection Prevenetion Program
2 Documents in Project
Summary
SCH Number
2003111009
Lead Agency
Metropolitan Water District of Southern California
Document Title
Mitigated Negative Declaration for the Cross Connection Prevenetion Program
Document Type
NOD - Notice of Determination
Received
Posted
9/22/2004
Present Land Use
Numerous
Document Description
Metropolitan is required by the State of California Code of Regulations to protect its treated water supply systems from potential contamination through the implementation of a cross connection prevention program. A cross connection is an unprotected connection between a potable water line and any source containing unapproved water or substances that are not classified as safe, wholesome, and potable. Existing potential contamination sites include locations where the drinking water supply feeder lines that may be subject to infiltration by contaminants include: air release valves, air vacuum valves, blow-off structures, and air stacks. Through the Cross Connection Prevention Program, Metropolitan will modify/relocate to these types of equipment in order to prevent potential contamination of drinking water supplies.
Contact Information
Name
Jeff Ford
Agency Name
Metropolitan Water District of Southern California
Contact Types
Lead/Public Agency
Phone
Location
Counties
Los Angeles, Orange, Riverside, San Diego
Cross Streets
Numerous
Zip
Numerous
Notice of Determination
Approving Agency
Metropolitan Water District of Southern California
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.