SAa #2004-0023-2

6 Documents in Project

Summary

SCH Number
2003102149
Lead Agency
City of Stockton
Document Title
SAa #2004-0023-2
Document Type
NOD - Notice of Determination
Received
Posted
5/26/2005
Present Land Use
Single Family Residential Z: Adjacent to Single-Family District GP: Low-Medium Density Residential
Document Description
SEIR considering realignment of a portion of the original project from Pershing Avenue to Manchester Avenue. The environmental document evaluated the potential environmental effects that would result from approval, construction and operation of the Wastewater Collection System No. 9 (System 9) project with the proposed Manchester Avenue alignment. The purpose of the System 9 project is to provide City wastewater collection service to an approximately 2,900-acre service area in the northeastern portion of the Stockton Metropolitan Area. The service area is composed of Future Growth Areas (FGAs) designated by the Stockton General Plan for planned urban development. The proposed wastewater collection system consists of two pump stations, approximately 1.6 miles of gravity wastewater trunk line and 3.9 miles of wastewater force main. The project is consistent with the City's adopted Wastewater Collection System Master Plan. The proposed project is located generally east of the UPRR tracks, south of Hammer and Foppiano Lanes, west of the Central California Traction RR, and north of Alpine Avenue and the Stockton Diverting Canal.

Contact Information

Name
Mark Martin
Agency Name
City of Stockton
Contact Types
Lead/Public Agency

Location

Cities
Stockton
Counties
San Joaquin
Cross Streets
N/A
State Highways
I-5
Railways
UPRR
Airports
N/A
Schools
Wilson, Madison, and El Dorado ES; University of Pacific
Waterways
Calaveras River

Notice of Determination

Approving Agency
City of Stockton
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print