SAa #2004-0023-2
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003102149
- Lead Agency
- City of Stockton
- Document Title
- SAa #2004-0023-2
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/26/2005
- Present Land Use
- Single Family Residential Z: Adjacent to Single-Family District GP: Low-Medium Density Residential
- Document Description
- SEIR considering realignment of a portion of the original project from Pershing Avenue to Manchester Avenue. The environmental document evaluated the potential environmental effects that would result from approval, construction and operation of the Wastewater Collection System No. 9 (System 9) project with the proposed Manchester Avenue alignment. The purpose of the System 9 project is to provide City wastewater collection service to an approximately 2,900-acre service area in the northeastern portion of the Stockton Metropolitan Area. The service area is composed of Future Growth Areas (FGAs) designated by the Stockton General Plan for planned urban development. The proposed wastewater collection system consists of two pump stations, approximately 1.6 miles of gravity wastewater trunk line and 3.9 miles of wastewater force main. The project is consistent with the City's adopted Wastewater Collection System Master Plan. The proposed project is located generally east of the UPRR tracks, south of Hammer and Foppiano Lanes, west of the Central California Traction RR, and north of Alpine Avenue and the Stockton Diverting Canal.
- Contact Information
-
Mark Martin
City of Stockton
Lead/Public Agency
425 N. El Dorado Street
Stockton, CA 95202-1997
Phone : (209) 937-8266
Location
- Cities
- Stockton
- Counties
- San Joaquin
- Cross Streets
- N/A
- State Highways
- I-5
- Railways
- UPRR
- Airports
- N/A
- Schools
- Wilson, Madison, and El Dorado ES; University of Pacific
- Waterways
- Calaveras River
Notice of Determination
- Approving Agency
- City of Stockton
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.