Woodland Davis Clean Water Agency Joint Intake and Fish Screen Project
11 Documents in Project
Summary
SCH Number
2003102095
Lead Agency
Reclamation District 2035
Document Title
Woodland Davis Clean Water Agency Joint Intake and Fish Screen Project
Document Type
NOD - Notice of Determination
Received
Posted
11/21/2014
Present Land Use
Agricultural (AG)/Agricultural General Zone (A-1)
Document Description
Under the Proposed Project/Action, Reclamation District 2035 (RD 2035) would construct and operate a new intake and fish screen facility on the Sacramento River to replace its existing unscreened diversion. The proposed facility would have the same maximum pumping capacity as the existing intake (400 cfs) to accommodate joint use with the Woodland Davis Clean Water Agency (WDCWA), the new facility would include space for pumps to serve the WDCWA. Under the proposed facility, RD 2035 would continue to pump up to 400 cfs for agricultural uses and WDCWA would pump up to 100 cfs for municipal uses.
Contact Information
Name
Brian Cary
Agency Name
CDFW, Wildlife Conservation Board
Contact Types
Lead/Public Agency
Phone
Location
Cities
Woodland
Counties
Yolo
Cross Streets
County Road 117 and 22
State Highways
I-5
Railways
Sierra Pacific
Waterways
Sacramento River
Notice of Determination
Approving Agency
Wildlife Conservation Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.