City College Master Plan: Greenhouse Site Short-Term Use/Construction Mitgation Project
7 Documents in Project
Summary
SCH Number
2003102086
Lead Agency
San Francisco Community College District
Document Title
City College Master Plan: Greenhouse Site Short-Term Use/Construction Mitgation Project
Document Type
EIR - Draft EIR
Received
Present Land Use
The 67-acre Main Campus is currently developed with a community college; the adjacent 11-acre South Balboa Reservoir and the North Balboa Reservoir are used for college parking. Both sites are within a P (Public) zoning district, and portions are within the 40-X, 65-A, and 105-E height and bulk districts. The campus is designated as "City College" on the Public School Facilities Plan in the Community Facilities Element of the San Francisco General Plan.
Document Description
The project includes approval and implementation of a Master Plan for the long-term development of the CCSF campuses. The EIR will focus on the Ocean Avenue campus, which is the main campus and has the majority of the planned and projected process. The proposed Ocean Avenue Campus Master Plan includes construction of a Community Wellness Center and related near-term projects, construction of other projects identified in the College's 2001 for bond measure, and possible implementation of other projects identified in a 2015 building program for Main Campus facilities. Implementation of these elements would involve the expansion of campus facilities and modification of campus access and circulation. The components of the master Plan would include construction of new College buildings; expansion of selected existing building; renovation of most existing buildings; demolition of several existing buildings; demolition of the berm between the North and South Reservoirs; construction of structured parking to replace existing surface parking spaces that would be eliminated and to provide additional spaces; provision of vehicle, pedestrian and bicycle access and circulation improvements; relocation of a recreational field; and enhancement of the campus landscaping.
Contact Information
Name
Peter Goldstein
Agency Name
San Francisco Community College District
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Francisco
Counties
San Francisco
Cross Streets
Phelan Avenue, Ocean Avenue, Judson Avenue, and Havelock Street
Total Acres
78
Parcel #
3179010/318001
State Highways
1, 35
Schools
Community College, Two Private High Schools
Waterways
San Francisco Bay
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 4 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Historic Preservation, Resources Agency, San Francisco Bay Conservation and Development Commission (BCDC), Department of Toxic Substances Control
State Reviewing Agency Comments
Department of Toxic Substances Control
Development Types
Educational
Local Actions
Master Plan
Project Issues
Air Quality, Cultural Resources, Cumulative Effects, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wildlife, Shadow, wind
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.