Cottonwood Creek Overlay Project - Agreement 2008-0112-R4

3 Documents in Project

Summary

SCH Number
2003101162
Lead Agency
California Department of Transportation, District 6
Document Title
Cottonwood Creek Overlay Project - Agreement 2008-0112-R4
Document Type
NOD - Notice of Determination
Received
Posted
9/11/2008
Present Land Use
Agricultural and Rural Residential
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the project applicant. Caltrans proposes to replace the Cottonwood Creek Bridge as part of the overlay and shoulder widening project in SR 145. Construction staging will require keeping half of the bridge open to traffic while the other half is being built then switching to work on the other side. The bridge will be a ocncrete structure with a steel rebar skeleton. Concrete support piles will be driven into the bed of Cottonwood Creek to support the structure. Rock slope protection (RSP) will also be placed on the bank and in the channel to prevent erosion around the bridge piers and abutments. A construction staging area of 30 feet on each side of the bridge will include installation of falsework in the channel.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Madera
Counties
Madera
Cross Streets
North of Avenue 5 to Avenue 11 1/2
Railways
SPRR
Waterways
Cottonwood Creek and the San Joaquin River
Township
12/13S
Range
17/18E

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print