Dana Point Harbor Sport Fishing Docks Pile Sleeving Project

9 Documents in Project

Summary

SCH Number
2003101142
Lead Agency
Orange County
Document Title
Dana Point Harbor Sport Fishing Docks Pile Sleeving Project
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2014
Present Land Use
Recreational Marinas/Dana Point Harbor Planned Community (City of Dana Point)/Harbor Marine Water (City of Dana Point)
Document Description
The Project consists of the installation of 20 round, 14-inch outer diameter steel guide pile sleeves over the 20 existing 10-inch outer diameter round steel guide piles of Docks 1 and 2 at the Sport Fishing Docks. The internal pile guides will be replaced with new larger ones to fit the new larger diameter piles. Each pile will be backfilled with high strength grout material to ensure the existing and new pile act together when subjected to loading. An approximately 100 foot by 60 foot area will be used for staging in the launch ramp parking area.

Contact Information

Name
Darren Bradford
Agency Name
RWQCB-San Diego Region
Contact Types
Lead/Public Agency

Location

Cities
Dana Point
Counties
Orange
Cross Streets
Golden Lantern Street / Dana Point Harbor Drive
Zip
92629
Total Acres
169.7
Parcel #
Water Area
State Highways
Hwy 1, I-5
Railways
OCTA Metrolink
Airports
No
Schools
Capistrano Valley Unified School District
Waterways
San Juan Creek and Pacific Ocean

Notice of Determination

Approving Agency
RWQCB-San Diego Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print