Alpine Water Users Association New Well and Related Infrastructure Project
2 Documents in Project
Summary
SCH Number
2003101126
Lead Agency
Alpine Water Users Association
(AWUA)
Document Title
Alpine Water Users Association New Well and Related Infrastructure Project
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2003
Present Land Use
residential & other water infrastucture
Document Description
The proposed Alpine Water Users Association (AWUA) project consists of the installation of a new well & related infrastructure producing an estimated 200-300 gallons per minute (gpm) of potable water to meet the requirements of AWUA's existing service area. Well development will be conducted immediately after the drilling operation has been completed. Distribution pipeline placement & connection from the discharge head to pressure zone 1 will require crossing a mainline sewer & drainage culvert, totaling 700 feet. It is estimated that less than 0.5 acre of land on the project site are expected to be disturbed by these activities.
Contact Information
Name
Phillip A. Broda
Agency Name
Alpine Water Users Association
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Bernardino
Cross Streets
Strawberry Peak Road (on the south) & Balsam Lane (on the southwest)
Parcel #
334-134-23, Lots 82-85, Tract 7320
State Highways
18
Waterways
between existing AWUA Wells #1 and #9
Township
2N
Range
3W
Base
SBB&M
Other Location Info
nearest community: Twin Peaks (not incorporated)
Other Information
base: San Bernardino Base & Meridian
quadrant: Harrison Mountain
map: USGS topographic 7.5 minute series
Notice of Determination
Approving Agency
Alpine Water Users Association
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.