Development Proposed by Apollo Real Estate Advisors, LLP
4 Documents in Project
Summary
SCH Number
2003101117
Lead Agency
City of West Hollywood
Document Title
Development Proposed by Apollo Real Estate Advisors, LLP
Document Type
NOD - Notice of Determination
Received
Posted
4/22/2005
Present Land Use
Occupied and unoccupied structures / Sunset Specific Plan
Document Description
The project is proposed for development on two sites within the City of West Hollywood's Sunset Specific Plan (i.e., Sites 4-C and 4-D). Site 4-C is located at the southeast corner of Sunset and La Cienega Boulevards. As proposed this site would contain a total of 235,000 square feet consisting of two hotels, retail, and restaurants plus 2,250 square feet of outdoor dining areas. Site 4-D is located on the south side of Sunset Boulevard between Alta Loma Road and La Cienega Boulevard. Proposed is development of 292,240 square feet consisting of retail/restaurants, and two (2) residential buildings provided by 468 parking spaces in a below Sunset Boulevard grade parking structure. A new below grade tunnel under La Cienega Boulevard would connect the Site 4C parking structure with the Site 4D parking structure.
Contact Information
Name
C.J. Amstrup
Agency Name
City of West Hollywood
Contact Types
Lead/Public Agency
Phone
Location
Cities
West Hollywood
Counties
Los Angeles
Cross Streets
Sunset and La Cienega Boulevards
Zip
90069
Total Acres
4.05
State Highways
2
Schools
To be determined
Other Location Info
8474-8490 & 8500-8544 Sunset Boulevard and 1234 & 1235 La Cienega Boulevard
Notice of Determination
Approving Agency
City of West Hollywood
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.