Goleta Slough Tidal Circulation Experiment

4 Documents in Project

Summary

SCH Number
2003101079
Lead Agency
City of Santa Barbara
Document Title
Goleta Slough Tidal Circulation Experiment
Document Type
NOD - Notice of Determination
Received
Posted
12/17/2003
Present Land Use
Goleta Slough General Plan: open space / recreational zoning: G-S-R/SD-3 (Goleta Slough Reserve/Coastal Zone)
Document Description
The Santa Barbara Airport is proposing to implement a short-term field experiment in the Goleta Slough to assess the feasibility of a long-term restoration program. The proposed field experiment would involve creating 2 small tidal basins by excavating portions of larger non-tidal basins, & installing culverts that connect to tidal channels. Each experimental basin would be located adjacent to a "control basin" (i.e. and existing non-tidal basin) to allow a comaprison of the hydrologic & ecological effects of tidal circulation with existing conditions. This experimental design would also allow a comparison of bird use in tidal & non-tidal areas to assess the effects on the bird strike conditions at the airport.

Contact Information

Name
Laurie Owens
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
James Fowler Road
Parcel #
073-450-003
State Highways
101, 217
Railways
Union Pacific
Airports
Santa Barbara
Schools
UCSB, Kellogg School, Goleta Valley Jr. HS, Isla Vista School
Waterways
Goleta Slough, Pacific Ocean
Other Location Info
500 Fowler Road

Notice of Determination

Approving Agency
City of Santa Barbara Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print