Back Basin Groundwater Storage Project

4 Documents in Project

Summary

SCH Number
2003101028
Lead Agency
Elsinore Valley Municipal Water District
Document Title
Back Basin Groundwater Storage Project
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2004
Present Land Use
Land Uses: Vacant Zoning: Flood Control General Plan Land Use: East Lake Specific Plan (residential, commercial, mixed use).
Document Description
An aquifer storage and recovery system to increase local water storage capacity within the District service area, consisting of 6 injection/extraction wells 2 monitoring wells and associated pipelines. During winter months imported water would be injected into the wells and stored in the Elsinore Groundwater Basin. The stored water would be extracted during dry periods when supplies may be reduced. A groundwater model prepared for the project indicated no adverse impacts on the groundwater basin.

Contact Information

Name
Philip Miller & Joe Mouawad
Agency Name
Elsinore Valley Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Lake Elsinore, Wildomar
Counties
Riverside
Cross Streets
Cereal and Stoneman
Total Acres
30
Parcel #
various
State Highways
Interstate 15
Airports
Skylark Airport
Schools
Jean Hayman Elementary,
Waterways
San Jacinto River, Temescal Wash, Lake Elsinore
Township
6S
Range
4W
Section
21
Base
SBBM
Other Information
Zip Code: 92530;92595 Schools: William Collier Elementary, Elsinore HS

Notice of Determination

Approving Agency
Elsinore Valley Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print