Allen Nylander
2 Documents in Project
Summary
SCH Number
2003092102
Lead Agency
Humboldt County
Document Title
Allen Nylander
Document Type
NOD - Notice of Determination
Received
Posted
12/8/2003
Present Land Use
Plan Designation: Residential Low Density (RL), 1-6 Dwelling Units per Acre as designated by the Eureka Community Plan.
Zoning: Residential One Family specifying a minimun lot size of 6,000 square feet (R-1*).
Document Description
A Parcel Map subdivision of 1.98 acre parcel into two parcels. Proposed Parcel 1 will be 60,085 sq. ft. and is developed with a single family residence. Proposed Parcel 2 will be 25,930 sq. ft. and is currently vacant. An exception to the road width and lot frontage standards is requested for proposed Parcel 2, pursuant to H.C.C Section 325-9. A Special Permit is required for the removal of five (5) trees. Water and sewer services will be provided by the Humboldt Community Services District.
Contact Information
Name
Michael Wheeler
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Eureka
Counties
Humboldt
Cross Streets
Harris St./O'Neil Ln.
Zip
95503
Total Acres
1.98
Parcel #
APN 016-141-05
State Highways
US 101
Railways
Northwestern Pac.
Schools
Eureka Union Schools
Waterways
Humboldt Bay
Township
5N
Range
1W
Section
25
Base
HM
Other Location Info
East side of O'Neil Lane, approximately 0.20 miles northeast from the intersection of O'Neil Lane with Harris St. on the property known as O'Neil Lane
Notice of Determination
Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.