Geotechnical Investigations at the North Haiwee Dam
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003091085
- Lead Agency
- Los Angeles County
- Document Title
- Geotechnical Investigations at the North Haiwee Dam
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/26/2004
- Present Land Use
- Natural Resources
- Document Description
- The Los Angeles Department of Water and Power (LADWP) would perform geotechnical trenching and boring to complete design studies for the proposed North Haiwee Dam No. 2 reconstruction. The geotechnical investigation includes excavation of trenches up to 300 feet long, 10 feet deep, and varying width in seven locations near the existing North Haiwee Dam. Various geotechnical borings also would be evaluated.
- Contact Information
-
Thomas A. Dailor
Los Angeles County Dept of Water and Power
Lead/Public Agency
111 North Hope Street, Room 1044
Los Angeles, CA 90012
Phone : (213) 367-0221
Location
- Counties
- Inyo
- Cross Streets
- Owens Valley & Sierra Nevada
- Total Acres
- 4.5
- State Highways
- 395
- Township
- 19/20S
- Range
- 37E
- Section
- 33/34
- Base
- MDBM
- Other Location Info
- southern End Owens Valley, north end Haiwee Reservoir
- Other Information
- Section: 3 & 4
Notice of Determination
- Approving Agency
- Los Angeles Department of Water and Power
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- LA Department of Water and Power 111 North Hope Street, Room 1044 Los Angeles, CA 90012
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.