Concurrence in the Issuance of a Modified Solid Waste Facilities Permit for Sun Street Transfer Station in County of Monterey, SWIS No. 27-AA-0110

7 Documents in Project

Summary

SCH Number
2003091068
Lead Agency
Salinas Valley Solid Waste Authority
Document Title
Concurrence in the Issuance of a Modified Solid Waste Facilities Permit for Sun Street Transfer Station in County of Monterey, SWIS No. 27-AA-0110
Document Type
NOD - Notice of Determination
Received
Posted
8/3/2016
Present Land Use
General Industrial
Document Description
Modified Solid Waste Facilities Permit (SWFP) to allow: 1 Removal of the Permitted Traffic Volume Limit of 296 vehicles per day (VPD) on the permit coverage page and instead updating the Permitted Traffic Volume to state: Traffic will be regulated as per Title 14, CA Code of Regulations (CCR), Section 17418.3. Traffic flow through the facility shall be controlled to prevent the following: (1) interference with or creation of a safety hazard on adjacent public streets or roads, (2) on-site safety hazards, and (3) interference with operations. 2. Updating the 2012 version of the SWFP to include more current references to governing documents by other regulatory agencies.

Contact Information

Name
Eric Kriuja
Agency Name
CalRecycle
Contact Types
Lead/Public Agency

Location

Cities
Salinas
Counties
Monterey
Cross Streets
Sun and Griffin
Zip
93901
Total Acres
6.75
Parcel #
003-051-067 and 078
State Highways
U.S. Highway 101
Railways
UPRR
Airports
Salinas Municipal
Waterways
Carr Lake, Natividad Creek, Alisal Creek

Notice of Determination

Approving Agency
CalRecycle
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.