Sun Street Transfer Station and Material Recovery Facility

7 Documents in Project

Summary

SCH Number
2003091068
Lead Agency
Salinas Valley Solid Waste Authority
Document Title
Sun Street Transfer Station and Material Recovery Facility
Document Type
NOD - Notice of Determination
Received
Posted
8/26/2005
Present Land Use
General Industrial
Document Description
The Salinas Valley Solid Waste Authority (Authority) is proposing to locate a Transfer Station and Material Recovery Facility (TS/MRF) that would accept and transfer solid waste materials delivered by residential and commercial self-haulers and franchise haulers. Due to the pending closure of the main landfill disposal site for the Salinas area, the Crazy Horse Landfill, transfer station operations will experience rapid growth as waste is directed to the TS/MRF for processing and shipment to the next closest disposal facility, Johnson Canyon Landfill. As a result, the project is expected to be operated in two phases: Project Phase 1 with Crazy Horse Landfill as the primary disposal site; and Project Phase 2 following the closure of Crazy Horse Landfill at which time disposal will shift to Johnson Canyon Landfill. This project would serve as a replacement of the existing Salinas Transfer Station (a privately owned and operated facility) for residential and commercial waste picked up under the City of Salinas waste-hauling franchise contract.

Contact Information

Name
Stephen Johnson
Agency Name
Salinas Valley Solid Waste Authority
Contact Types
Lead/Public Agency

Location

Cities
Salinas
Counties
Monterey
Cross Streets
Sun and Griffin
Zip
93901
Total Acres
6.75
Parcel #
003-051-067 and 078
State Highways
U.S. Highway 101
Railways
UPRR
Airports
Salinas Municipal
Waterways
Carr Lake, Natividad Creek, Alisal Creek

Notice of Determination

Approving Agency
Salinas Valley Solid Waste Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print