John Wayne Airport Settlement Amendment Implementation Plan (SEIR 582)
3 Documents in Project
Summary
SCH Number
2003091046
Lead Agency
Orange County
Document Title
John Wayne Airport Settlement Amendment Implementation Plan (SEIR 582)
Document Type
NOD - Notice of Determination
Received
Posted
10/20/2004
Present Land Use
Various designations.
Document Description
The Settlement Amendment Implementation Plan consists of implementing the capacity and facility improvements permitted by the settlement amendment, with certain revisions that are consistent with Final Program EIR 582 and Addendum 582-1. The revisions include: construction of a new terminal building south of the existing facility, an extension of the existing terminal to the north, relocation of the existing maintenance building, an extension of the hydrant refueling system, construction of a new multi-story parking structure, modification of the onsite roadway in front of the existing terminal, expansion of the apron area, modification of the leaseholdings area on the east side of the Airport, provision of an additional right-turn lane on westbound Campus Drive to Bristol Street North, modification of ancillary airfield components, relocation of various parking operations, and relocation or removal of the Edison 66 kV substation located south of the southwest parking structure.
Contact Information
Name
Alan Murphy
Agency Name
John Wayne Airport
Contact Types
Lead/Public Agency
Phone
Location
Counties
Orange
State Highways
405, 55, 73
Airports
John Wayne
Other Location Info
Unincorporated Orange County
Notice of Determination
Approving Agency
County of Orange
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.