Palomar Energy Project

Summary

SCH Number
2003089011
Lead Agency
California Energy Commission
Document Title
Palomar Energy Project
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2003
Document Description
550-megawatt (nominal) natural gas-fired power plant, consisting of two combustion turbine-generators equipped with dry low combustors and evaporative inlet air coolers, two heat recovery steam generators equipped with duct burners, selective catalyst reduction (SCR) and oxidation catalyst emission control systems, a steam turbine generator, associated auxiliary systems and equipment, and a new 230 kV switchyard that will interconnect with an existing electric transmission line located immediately adjacent to the project site.

Contact Information

Name
Bob Eller
Agency Name
California Energy Commission
Contact Types
Lead/Public Agency

Location

Cities
Escondido
Counties
San Diego

Notice of Determination

Approving Agency
California Energy Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print