Angora Fisheries & SEZ Enhancement Project

5 Documents in Project

Summary

SCH Number
2003082129
Lead Agency
El Dorado County
Document Title
Angora Fisheries & SEZ Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/6/2010
Document Description
The intent of this project is to modify and improve Angora Creek in the vicinity of the culverts under Lake Tahoe Boulevard to improve fish passage. These improvements will adjust channel morphology where the creek has become entrenched, stabilize banks with vegetation, and improve passage at two existing culverts by installing a 3 sided bridge structure. Anticipated construction activities include channel reconstruction, bioengineering bank stabilization, riffle pool sequences, reestablishment or creation of fish and wildlife habitat, construction of a 3 sided concrete bridge, removal of debris, removal and restoration of temporary access roads, finish grading, salvaging of existing native vegetation, planting of shrubs and sod, willow stakes, seeding and mulching and construction site temporary BMPs. The Project will be constructed in the late summer when flows are the lowest in order to minimize impacts to the area and to fish and wildlife species. However, it is anticipated that the creek will still require diversion and certain areas may require dewatering to construct the Project.

Contact Information

Name
Laurie A. Soule
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Lake Tahoe Boulevard and View Circle
Total Acres
3+/-
Waterways
Angora Creek
Township
12N
Range
18E
Section
18
Base
MDB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.