Palomar Station Specific Plan

6 Documents in Project

Summary

SCH Number
2003081116
Lead Agency
City of San Marcos
Document Title
Palomar Station Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2011
Present Land Use
Site is currently vacant. Z: Industrial and Light Industrial.
Document Description
The CA DFG is issuing an agreement regarding the Stream Alteration to the project applicant, the Palomar Station owner, LLC. The project is limited to construction of a Planned Smart Growth, mixed-use development on 14.3 acres. The site was selected for this project because of its centralized location adjacent to regional transportation hubs. The purpose of this Smart Growth community is to improve the quality of life in San Marcos, support existing public transit, create a walkable neighborhood, use land more efficiently through compact development design and reduce urban sprawl. The Smart Growth design is intended to encourage social, civic, and physical activity, and protect the environment while stimulating economic growth.

Contact Information

Name
Darren Bradford
Agency Name
DFG
Contact Types
Lead/Public Agency

Location

Cities
San Marcos
Counties
San Diego
Cross Streets
Las Posas Road/Armorlite Drive
Total Acres
14.5
State Highways
SR 78
Railways
Adjacent to existing rail line/
Waterways
San Marcos Creek, Second San Diego Aqueduct
Other Information
Railways: Adjacent to existing rail line/adjacent to North County Transit District's future Sprinter Line.

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print