St. Andrew's Presbyterian Church Expansion, General Plan Amendment and Use Permit (PA2002-265)

3 Documents in Project

Summary

SCH Number
2003081065
Lead Agency
City of Newport Beach
Document Title
St. Andrew's Presbyterian Church Expansion, General Plan Amendment and Use Permit (PA2002-265)
Document Type
NOD - Notice of Determination
Received
Posted
8/17/2005
Present Land Use
The 3.94-acre site is currently improved with 104,440 square feet as St. Andrews Presbyterian Church. Several buildings, including a 1,200-seat sanctuary, classrooms, and administrative facilities occupy the existing structures. The property is zoned R-1 and R-2, which is consistent with the Low Density Residential General Plan land use designation.
Document Description
General Plan Amendment to increase the maximum allowable gross floor area tht can be developed at the project site by 15,000 square feet; change the zoning district from R-1 & R-2 to GEIF (Government, Educational and Institutional Facilities); and a Use Permit to allow the demolition and replacement of 2 church buildings and the construction of a youth and family center with a gymnasium.

Contact Information

Name
James Campbell
Agency Name
City of Newport Beach
Contact Types
Lead/Public Agency

Location

Cities
Newport Beach
Counties
Orange
Cross Streets
15th Street & Irvine Avenue
Zip
92663
Total Acres
3.94
Parcel #
049-252-11
State Highways
SR55
Waterways
Newport Bay & Pacific Ocean

Notice of Determination

Approving Agency
City of Newport Beach
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print