Resource Utilization Company Quarry Surface Mining Permit APN 529-131-11 (Orleans area); Case Nos.: CUP-02-31/SMP-02-03/RP-02-03

3 Documents in Project

Summary

SCH Number
2003072098
Lead Agency
Humboldt County
Document Title
Resource Utilization Company Quarry Surface Mining Permit APN 529-131-11 (Orleans area); Case Nos.: CUP-02-31/SMP-02-03/RP-02-03
Document Type
NOD - Notice of Determination
Received
Posted
10/31/2003
Document Description
A Conditional Use Permit, Surface Mining Permit, Reclamation Plan and review of financial assurance cost estimates for a surface mining operation involving an upland rock quarry with a proposed total extraction of up to 420,000 cubic yards of aggregate material over an expected life of 15 years. Up to 50,000 cubic yards of material will be extracted per year, with an average of 20,000 cubic yards per year over a five-year period. Usable rock product consists of moderately to loosely consolidated sand and gravel with cobble materials of primarily 8" diameter or less in. The quarry operations will involve excavation, processing, loading and hauling. No blasting or drilling will be conducted on site. Heavy equipment to be used on site includes excavators, loaders, catapiller tractors, and dumptrucks. Rock will be hauled by 12 to 14 yd dump trucks. The project includes a caretaker's residence served by on-site sewage disposal system.

Contact Information

Name
Michael Wheeler
Agency Name
Humboldt County Planning Department
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
State Highway 96 and Eyesee Road
Zip
95556
Total Acres
13.0
Parcel #
529-131-11
State Highways
96
Waterways
Klamath River
Township
11N
Range
5E/6E
Section
36/31
Base
HM
Other Location Info
Orleans

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print