Comstock Homes Monarch Point Development and Portions of the Ellwood-Devereux Open Space Plan;

5 Documents in Project

Summary

SCH Number
2003071179
Lead Agency
City of Goleta
Document Title
Comstock Homes Monarch Point Development and Portions of the Ellwood-Devereux Open Space Plan;
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2006
Present Land Use
The residential development site is currently located in the City of Goleta in the northwest corner of Santa Barbara Shore Park. The site is zoned Recreation. The Ellwood Mesa Open Space would be made up of a number of parcels that are currently zoned Planned Residential and Residential.
Document Description
The operator intends to alter the streambed by restoring previously and newly graded portions of the channel with native vegetation, removing waste and toxic drums, including all the contaminated soil, and constructing 5 storm drain outlets with ungrouted rip-rap aprons, and improvements per the tract grading plans (9/23/05) and approved by the City of Goleta on 9/27/05. The channel shall be restored by planting native plant species on the banks per the mitigation plan (Habitat Restoration Plan) prepared by Van Atta Associates on 7/20/05, approved by the City of Goleta on 7/22/05 and the Coastal Commission on 8/16/05. SAA# 1600-2006-0067-R5

Contact Information

Name
Natasha Lohmus
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
South of Hollister Avenue between Pebble Beach Drive and Las Armas Road
Total Acres
116.16
Parcel #
079-210-067, 079-210-013, -014, -015, -024, -051 and others
State Highways
101
Railways
Union Pacific
Airports
Santa Barbara Airport
Waterways
Pacific Ocean
Section
Multi.

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print