University of California, Santa Barbara Faculty and Family Student Housing and the Ellwood-Devereux Open Space Plan Components

10 Documents in Project

Summary

SCH Number
2003071178
Lead Agency
University of California, Santa Barbara
Document Title
University of California, Santa Barbara Faculty and Family Student Housing and the Ellwood-Devereux Open Space Plan Components
Document Type
NOD - Notice of Determination
Received
Posted
4/19/2006
Present Land Use
Recreational Uses

Document Description
In September 2004, the University of California amended its Long Range Development Plan to designate land uses on the North and West Campus for faculty and family student housing development, along with open space improvements. These university projects were part of the overall Joint Proposal for the Ellwood-Devereux Coast. Amendment #1 makes minor revisions to the previous land use and design approvals. The land use designations remain the same. The number of units in the faculty housing project are reduced from 236 to 215 to eliminate impacts to wetland. The number of units in the Student family housing project remains the same (151 units). For consistency with the Coastal Act, several new policies are proposed to be added to the LRDP related to the North Campus. Project elements of the Open Space and Habitat Management Plan remain the same.

Contact Information
Shari Hammond
University of California, Santa Barbara
Planning Design and Construction 1111 Franklin Street, 6th Floor
Oakland, CA 94607-5200

Phone : (805) 893-3796

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Phelps, Storke, and El Colegio Roads
Total Acres
~360
Parcel #
073-090-061, 073-090-13, 073-090-061
State Highways
101
Airports
Santa Barbara
Waterways
Goleta Slough

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
University of California

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search