Bridge Footing Repair - Arroyo Grande Creek

3 Documents in Project

Summary

SCH Number
2003071171
Lead Agency
California Department of Transportation, District 5
Document Title
Bridge Footing Repair - Arroyo Grande Creek
Document Type
NOD - Notice of Determination
Received
Posted
7/9/2004
Present Land Use
Transportation corridor.
Document Description
The project will back fill the damaged creek bank with imported material and repair the existing, damaged RSP. Repair will involve dewatering the site, excavating the undersized rock from the creek, replacing damaged filter fabric in the excavated area, placing light RSP on the new fabric, and capping the repaired area with 1-ton RSP. A low flow channel will be created along the channel bottom to provide for fish passage during construction. It is anticipated that it will be necessary to remove trapped aquatic organisms from the construction area after the coffer dams are in place and the area isolated. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2003-5357-3 pursuant to Section 1602 of the Fish and Game Code to the project operator.

Contact Information

Name
Fred Botti
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Arroyo Grande
Counties
San Luis Obispo
Cross Streets
Highway 101
Total Acres
0.165
State Highways
Highway 101
Waterways
Arroyo Grande Creek
Township
32S
Range
13E
Base
OceanoQu

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print