Fish Passage Improvement on Quiota Creek, Crossings no. 2
11 Documents in Project
Summary
SCH Number
2003071160
Lead Agency
Cachuma Operation and Maintenance Board
(COMB)
Document Title
Fish Passage Improvement on Quiota Creek, Crossings no. 2
Document Type
NOD - Notice of Determination
Received
Posted
4/15/2011
Present Land Use
Agriculture, Ranching & Rural Development / N.A. / Various
Document Description
The project is designed to improve safety, and improve steelhead passage within a spawning and rearing area, critical to the steelhead population downstream of Bradbury Dam. Crossing 2 is a concrete Arizona type structure with a damaged culvert underneath that only partly conveys flow. This crossing is being replaced with a 60 foot bottomless arched culvert with one rock weir and two riffles with vertical rock slope protection and the banks will be revegetated with native plants. This project is in cooperation with the Santa Ynez River Technical Advisory Committee and supported by the Department's fishery grants program.
Contact Information
Name
Natasha Lohmus
Agency Name
DFG - South Coast Region
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lompoc, Solvang
Counties
Santa Barbara
Waterways
Santa Ynez River and Tributaries Downstream of Bradbury Dam
Other Location Info
City of Santa Ynez
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.