South Coast Beach Communities Septic to Sewer Project (Project); Clean Beaches Initiative (CBI) Grant No. 601
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003071115
- Lead Agency
- Carpinteria Sanitary District
- Document Title
- South Coast Beach Communities Septic to Sewer Project (Project); Clean Beaches Initiative (CBI) Grant No. 601
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/5/2007
- Present Land Use
- Residential, General Commercial, Research Development Industrial, Transportation Corridor, and Open Space/Recreation
- Document Description
- The proposed project includes the removal of on-site septic systems and construction of publicly owned and operated sanitary sewer system to serve 72 existing homes in the beachfront community of Rincon Point, 37 homes in the Sandyland Cove Community, and 26 homes and one undeveloped lot in the San Point Road Community.
- Contact Information
-
Kari Schumaker
State Water Resources Control Board
Lead/Public Agency
Division of Financial Assistance 1001 I Street, 16th Floor
Sacramento, CA 95814
Phone : (916) 341-7388
Location
- Cities
- Carpinteria
- Counties
- Santa Barbara Ventura
- Regions
- Unincorporated
- Parcel #
- Various
- State Highways
- US-101
- Waterways
- Pacific Ocean
Notice of Determination
- Approving Agency
- State Water Resources Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- State Water Resources Control Board
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.