Carpinteria Sanitary District's South Coast Beach Communities Septic to Sewer Project Supplemental Environmental Impact Report

7 Documents in Project

Summary

SCH Number
2003071115
Lead Agency
Carpinteria Sanitary District
Document Title
Carpinteria Sanitary District's South Coast Beach Communities Septic to Sewer Project Supplemental Environmental Impact Report
Document Type
FIN - Final Document
Received
Present Land Use
Residential, General Commercial, Research Development Industrial, Transportation Corridor, and Open Space/Recreation

Document Description
The project consists of annexations of property into the CSD, establishment of assessment districts for project financing, and construction and operation of wastewater collection and transfer infrastructure. The proposed infrastructure component of the project would involve the construction and operation of five separate wastewater conveyance systems to serve each of the five beach communities. Each would require the construction of public and private sewer facilities. Public sewer facilities would be constructed and operated by CSD, and would provide each homeowner with the opportunity to have public sanitary sewer service. Private sewer facilities would be required to connect homes to public sewer system, from which wastewater would be conveyed to the Carpinteria Wastewater Treatment Plant (CWWTP). The public infrastructure would include gravity sewers, force mains, laterals to the property lines of the private lots, pump stations, manholes, and cleanout stations. The project, as described above, was the subject of a Final Environmental Impact Report (FEIR) certified by the CSD Board of Directors on September 7, 2004. However, since that time, the District has identified design revisions to the infrastructure proposed for the Rincon Point Community that are intended to reduce significant unavoidable environmental impacts identified in the FEIR. These revisions include but are not limited to the following alternative construction design measures: rerouting of the sewer line from the Rincon Point Community to the existing collection system, use of low pressure force mains, and relocation of pump station(s). It was also determined that an additional sewer line segment, not previously analyzed would be required in the Rincon Point Community.

Contact Information
Craig Murray
Carpinteria Sanitary District
5300 Sixth Street
Carpinteria, CA 93013

Phone : (805) 684-7214

Location

Cities
Carpinteria
Counties
Santa Barbara Ventura
Parcel #
Various
State Highways
US-101
Waterways
Pacific Ocean

Notice of Completion

Development Type
Other (sewer lines)
Local Action
Other Action Other Action: Septic to Sewer
Project Issues
Aesthetic/Visual Agricultural Land Air Quality Archaeologic-Historic Biological Resources Coastal Zone Drainage/Absorption Flood Plain/Flooding Forest Land/Fire Hazard Geologic/Seismic Minerals Noise Population/Housing Balance Public Services Recreation/Parks Schools/Universities Septic System Sewer Capacity Soil Erosion/Compaction/Grading Solid Waste Toxic/Hazardous Traffic/Circulation Vegetation Water Quality Water Supply Wetland/Riparian Wildlife Growth Inducing Land Use Cumulative Effects

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print