Napa River Tributary Bridge Replacement

Summary

SCH Number
2003069003
Lead Agency
Fish & Game #3
Document Title
Napa River Tributary Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2003
Document Description
The project is the removal and replacement of an existing wooden bridge that crosses an unnamed tributary to the Napa River between the Joseph Phelps Vineyards River Ranch farming headquarters and the recently constructed River Ranch Farmworker Housing Center located west of Silverado Trail, approximately 0.4 miles north of Talpin Road in Napa County. The wooden bridge will be replaced with a new precast concrete bridge with concrete abutments placed beyond the top of bank of the existing stream channel. The existing bridge consists of stone abutments that were built into the original stream channel many years ago. As part of this project, these stone and concrete abutments will be completely removed from the watercourse to allow the channel to return to its natural form. The only work to be performed within the watercourse will be the removal of the exisitng bridge and abutments. Construction of the new bridge abutments and placement of the new bridge will be performed entirely outside of the stream channel. The construction of the proposed bridge replacement will begin in July, 2003 and take approximately one to two months to complete. All construction within the watercourse will take place when the stream is dry.

Contact Information

Name
Heather McCollister
Agency Name
Department of Fish and Game, Region 3
Contact Types
Lead/Public Agency

Location

Counties
Napa

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print