Construction and Operation of an Organizational Maintenance Shop at the California National Guard Armory, San Diego, California

3 Documents in Project

Summary

SCH Number
2003064002
Lead Agency
California Army National Guard
Document Title
Construction and Operation of an Organizational Maintenance Shop at the California National Guard Armory, San Diego, California
Document Type
NOD - Notice of Determination
Received
Posted
12/22/2004
Present Land Use
Institutional Land
Document Description
Under the proposed action, a new organizational maintenance shop (OMS) would be constructed to provide adequate facilities to support the military equipment and vehicles assigned to the armory. The proposed OMS would be on the southern half of the San Diego Armory property, across from the main armory building. The new facility would be 31,799 SF and would include a maintenance shop, a flammable materials facility, a controlled waste facility, and an unheated metal storage building. The project also includes approximately 162,214 SF of paving and 1,660 linear feet of fencing. Construction would take an estimated 18 months to complete, would require approximately 10 workers, and would involve various types of equipment, including a bulldozer, backhoe, grader, and vibrating roller. During the construction period, all equipment and vehicles would be staged on the project site, and construction activities, such as grading, excavating, and compaction, would disturb approximately 5,000 cubic yards of soil within a 4.5-acre footprint.

Contact Information

Name
Douglas Bryceson
Agency Name
California Army National Guard
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Mesa, College Drive, and Armstrong Street
Zip
92111
Total Acres
4.5
State Highways
163, I-805
Airports
Montgomery Field Airport
Schools
Multiple

Notice of Determination

Approving Agency
California Army National Guard
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print