City of Turlock - Harding Drain Bypass Project

12 Documents in Project

Summary

SCH Number
2003062002
Lead Agency
City of Turlock
Document Title
City of Turlock - Harding Drain Bypass Project
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2008
Present Land Use
Various
Document Description
The City is proposing the construction of a new force main and outfall from the City's existing outfall at the Harding Drain located at the intersection of Harding Road and Prairie Flower Road to the eastern bank of the San Joaquin River. Other facilities associated with the force main, will include a pump station, post-aeration structure, submerged outfall and gravity line connecting the post-aeration structure to the outfall. As analyzed in the EIR, the original plan was to install the pipeline by jack and bore at all three crossing locations. Under the modified plan, the installation method will be by digging an open cut across the Drain during the non-irrigation season and non-rainfall season. The force main will be installed into the open cut and then the TID facilities will be restored to pre-project condition. The crossing of TID Lateral No. 5 at Prairie Flower Road will still be by the original method of bore and jack.

Contact Information

Name
Michael I. Cooke
Agency Name
City of Turlock
Contact Types
Lead/Public Agency

Location

Cities
Turlock
Counties
Stanislaus
Cross Streets
Harding Road
Parcel #
various
Railways
Tidewater Southern
Waterways
San Joaquin River

Notice of Determination

Approving Agency
City of Turlock
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.