SAA #1600-2011-0110-R5
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003061123
- Lead Agency
- Orange County Water District
- Document Title
- SAA #1600-2011-0110-R5
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/29/2011
- Present Land Use
- Open Space
- Document Description
- The project involves repair of two existing 7-foot wide by 7-foot wide reinforced Concrete Boxes (RCB) used to convey flows from Weir Pond 3 to Weir Pond 4, and the construction of a 600 concrete headwall around each opening of the RCB structures. Additionally, an existing 48-inch diameter pipe will be internally retrofitted with a supplemental structure (insertion of a sleeve within existing pipe) to regain the lost capacity of the existing structure, and the construction of a new 90-inch drain-tube to allow for the transfer of surface water from Weir Pond 3 to Weir Pond 4. The two existing 42-inch diameter drain-tubes connecting Weir Ponds 3 and 4 will be decommissioned and left in place.
- Contact Information
-
Mr. Barabe
DFG
South Coast Region 4949 Viewridge Avenue
San Diego, CA 92123
Phone : (858) 467-2717
Location
- Cities
- Anaheim
- Counties
- Orange
- Cross Streets
- Lakeview Avenue & La Palma Avenue
- Zip
- 92807
- Total Acres
- 5
- State Highways
- 91 Fwy
- Waterways
- Santa Ana River
Notice of Determination
- Approving Agency
- DFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- OC Water District 18700 Ward Street Fountain Valley, CA 92708 Contact: Dan Bott Ph: 714-378-3256
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.