SAA #1600-2011-0110-R5

3 Documents in Project

Summary

SCH Number
2003061123
Lead Agency
Orange County Water District
Document Title
SAA #1600-2011-0110-R5
Document Type
NOD - Notice of Determination
Received

Document Description
The project involves repair of two existing 7-foot wide by 7-foot wide reinforced Concrete Boxes (RCB) used to convey flows from Weir Pond 3 to Weir Pond 4, and the construction of a 600 concrete headwall around each opening of the RCB structures. Additionally, an existing 48-inch diameter pipe will be internally retrofitted with a supplemental structure (insertion of a sleeve within existing pipe) to regain the lost capacity of the existing structure, and the construction of a new 90-inch drain-tube to allow for the transfer of surface water from Weir Pond 3 to Weir Pond 4. The two existing 42-inch diameter drain-tubes connecting Weir Ponds 3 and 4 will be decommissioned and left in place.

Contact Information
Mr. Barabe
DFG
South Coast Region 4949 Viewridge Avenue
San Diego, CA 92123

858 467-2717

Location

Cities
Anaheim
Counties
Orange
Cross Streets
Lakeview Avenue & La Palma Avenue
Zip
92807
Total Acres
5
State Highways
91 Fwy
Waterways
Santa Ana River

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
OC Water District 18700 Ward Street Fountain Valley, CA 92708 Contact: Dan Bott Ph: 714-378-3256

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search