Ponderosa School

2 Documents in Project

Summary

SCH Number
2003061110
Lead Agency
Anaheim Elementary School District (AESD)
Document Title
Ponderosa School
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2003
Present Land Use
Public Facilities
Document Description
The entire proposed Ponderosa School development site consists of 15.1 acres. Of this total, 7.80 acres will be dedicated to the reconfigured park, 3.91 acres will be joint-use, and 3.41 acres will be dedicated to the new school campus. The Master Plan calls for new campus buildings to be located in the southeasterly portion of the expanded park. The campus will be arranged in a "L"-shaped structure with the school's main parking area located to the south of the campus, adjacent to Wilken Way. A second parking area for use by the park and community center will be located to the north of the campus, adjacent to Orangewood Avenue. This latter parking area may also be used as overflow parking for the school. These new campus buildings will have a total floor area of up to 113,000 square feet and house 48 teaching stations. The proposed community library will have a total floor area of up to 17,000 square feet.

Contact Information

Name
Gordon Itow
Agency Name
Anaheim City School District
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Cross Streets
Haster / Orangewood
Zip
92805
Total Acres
7.8
State Highways
I-5
Waterways
Santa Ana River

Notice of Determination

Approving Agency
Anaheim City School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print