Oak Hills Well #5

4 Documents in Project

Summary

SCH Number
2003061064
Lead Agency
San Bernardino County
Document Title
Oak Hills Well #5
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2009
Present Land Use
Community Center Development (CCD) and Open Space (OS) presently vacant with one existing reservoir.
Document Description
The project is the upgrading of an existing reservoir plant site and the construction of a new well with a pipeline interconnecting the two facilities. The new facilities will be located in Pressure Zone 3 and will provide additional capacity and water supply to all four pressure zones within CSA 70J. The existing reservoir site is known as Site 2A and is located at the southwest corner of El Centro Road and Caliente Road. The site currently has two in-service 210,000-gallon steel tank reservoirs and a booster station that pumps stored water produced from the lower pressure zones and presently serves zones 3 and 4. A new water well (No. 5) will be drilled on a 0.5-acre site approximately 1,500 feet east of Site 2A, following along the corridor of El Centro Road. The new 1,100-foot deep production well is estimated to yield approximately 1,000 gpm. A new water transmission main will connect the new production well to the upgraded reservoir site. The line would essentially follow the alignment of El Centro Road (a non-dedicated road) and travel east/west approximately 1,500 feet between the two facilities.

Contact Information

Name
Gary Martin
Agency Name
San Bernardino County Office of Special Districts
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Regions
Unincorporated
Cross Streets
East of I-15, Caliente Road & El Centro Rd.
Total Acres
<2.0
Parcel #
3039-441-01,02 -271-02
State Highways
I-15
Waterways
Oro Grande Wash
Township
3N
Range
5W
Section
32&33
Base
SBBM

Notice of Determination

Approving Agency
San Bernardino County Special Districts
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print