2012 Facilities Master Plan El Camino College

7 Documents in Project

Summary

SCH Number
2003061012
Lead Agency
El Camino Community College District
Document Title
2012 Facilities Master Plan El Camino College
Document Type
SIR - Supplemental EIR
Received

Document Description
Construction, operation and maintenance of facilities in the 2012 Facilities Master Plan to accommodate projected enrollments in 2020. A net increase of 34,721 ASF will result from project buildout, with ~410,000 ASF of demolition and 445,000 ASF of new construction at buildout in 2020. A third level of 700 parking spaces will be added to the existing two-level Lot F Channel Parking Structures. The project will serve an increase of 63,206 WSCH or approximately an increase of 3,600 FTES.

Contact Information
Tom Brown
El Camino Community College District
16007 Crenshaw Blvd.
Torrence, CA 90506

310 660 3593 x6172

Location

Coordinates
33°53'03"N 118°19'59"W
Cities
Torrance
Counties
Los Angeles
Cross Streets
Crenshaw and Manhattan Beach Boulevards
Zip
90506
Total Acres
126
State Highways
Hwy 107
Schools
Carr Elem et al
Other Location Info
El Camino Village

Notice of Completion

Review Period Start
Review Period End
Development Type
Educational (Net increase of 34,721 ASF) Other (700 space 3rd level to existing Lot F Parking Structure)
Local Action
Master Plan
Project Issues
Archaeologic-Historic Drainage/Absorption Geologic/Seismic Noise Public Services Traffic/Circulation Land Use Cumulative Effects Other Issues Other Issues: GHGE
Reviewing Agencies
California Coastal Commission California Department of Parks and Recreation California Highway Patrol Caltrans, District 7 Department of Fish and Wildlife, Region 5 Department of Toxic Substances Control Department of Water Resources Native American Heritage Commission Regional Water Quality Control Board, Region 4 Resources Agency
Download CSV New Search