United Technologies Corporation, Pratt and Whitney Space Propulsion, Hazardous Waste Facility Permit Class 3 Modification
2 Documents in Project
Summary
SCH Number
2003052084
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
United Technologies Corporation, Pratt and Whitney Space Propulsion, Hazardous Waste Facility Permit Class 3 Modification
Document Type
NOD - Notice of Determination
Received
Posted
12/22/2003
Present Land Use
Agricultural Use (Industrial Use Permit)
Document Description
United Technologies Corporation (UTC), Pratt and Whitney Space Propulsion Division is seeking approval from the California Department of Toxic Substances Control (DTSC) for a Class 3 Modification to its current Hazardous Waste Facility Permit. This discretionary action was undertaken by DTSC pursuant to its authority under Chapter 6.5 and California Code of Regulations, Section 66270.42. If approved, the permit would allow UTC to conduct the following modifications at its existing hazardous waste storage and treatment facility located at 600 Metcalf Road, San Jose.
Contact Information
Name
Andrew Berna-Hicks
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Cities
Morgan Hill, San Jose
Counties
Santa Clara
Cross Streets
Metcalf Road
Zip
95138-0015
Total Acres
2
Parcel #
627-11-009,627-11-013,627-11-014,627-11-015,627-12-016,627-13-001,627-13-002,627-13-003......
Waterways
Anderson Reservoir
Notice of Determination
Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.