Grant Street / Foss Creek Culvert Crossing Extension Project

2 Documents in Project

Summary

SCH Number
2003052025
Lead Agency
City of Healdsburg
Document Title
Grant Street / Foss Creek Culvert Crossing Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
12/9/2009
Document Description
At present, the existing crossing of Grant Street over Foss Creek can only accommodate two vehicle lanes and lacks pedestrian sidewalks. The City is proposing to widen an approximately forty-foot long section of Grant Street from a width of approximately 19' to 50' in order to install public sidewalk on both sides of the street. The location of this project is within the North Coast Railroad Authority's right-of-way. The new street section would include 5-foot wide public sidewalk along both sides of the street, safety railings at the back of sidewalks over the creek, and improved pedestrian access through the remainder of the railroad's right-of-way, including an asphalt concrete surface over the track rails. The widened street section, which would match existing adjacent sections of Grant Street, would allow two traffic lanes, parking lanes on both sides of the street and the two sidewalks.

Contact Information

Name
Richard Fitzgerald
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Healdsburg
Counties
Sonoma
Cross Streets
Healdsburg Ave. (to the east) and Grove St. (to the west)
Zip
95448
Total Acres
.0367
Parcel #
853-49-10
State Highways
101
Railways
North Coast Railroad Authority
Airports
Healdsburg Municipal
Schools
Healdsburg Unified School District
Waterways
Foss Creek, Dry Creek and Russian River
Township
9N
Range
9W
Section
20
Base
Healdsbu

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A