Interstate 80 (I-80) Westbound Cordelia Commercial Vehicle Enforcement Facility Project (04-0A53T) (Lake or Streambed Alteration Agreement No. EPIMS SOL-51987-R
7 Documents in Project
Summary
SCH Number
2003052021
Lead Agency
California Department of Transportation, District 4
(DOT)
Document Title
Interstate 80 (I-80) Westbound Cordelia Commercial Vehicle Enforcement Facility Project (04-0A53T) (Lake or Streambed Alteration Agreement No. EPIMS SOL-51987-R
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2025
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-SOL-51987-R3), pursuant to Fish and Game Code section 1602, the project Applicant, California Department of Transportation.
The proposed Project will construct a new Class B Facility (defined as an independent California Highway Patrol command facility), approximately 0.7 mile to the east of its current location (Exhibit A). The Project will construct two new off-ramps to the CCVEF, one directly from I-80 and the other from State Route (SR) 12, providing improved operations at the westbound SR 12/I-80 connector. A new I-80 on-ramp from the CCVEF will cross Suisun Creek. To facilitate this crossing, an existing pedestrian bridge will be removed, and a new free span bridge over Suisun Creek will be constructed. The new creek crossing will be composed of three precast concrete girders that clear span the creek, to support an on-ramp with shoulders, 4-foot inside and 8-foot outside, and one 12-foot travelled lane. The girders support a reinforced concrete bridge deck which is also cantilevered from the exterior girders. The girders are supported on abutments placed on each creek bank. The bridge abutments will be placed above top of bank and rock slope protection (RSP) will be placed around the bridge abutments above top of bank.
Contact Information
Name
Karen Taylor
Agency Name
CA Department of Fish and Wildlife
Job Title
Senior Environmental Scientist (Specialist)
Contact Types
Lead/Public Agency
Phone
Name
Howell Chan
Agency Name
California Department of Transportation
Job Title
Lead Agency Contact
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Fairfield
Counties
Solano
Regions
San Francisco Bay Area
Other Location Info
The I-80 Westbound Cordelia Commercial Vehicle Enforcement Facility (CCVEF) Project is located along Interstate 80 (I-80) area is located in the City of Fairfield and unincorporated Solano County, California, east of the unincorporated community of Cordelia (Exhibit A). The Project 144.61-acre site is located within the Fairfield South, California 7.5- minute United States (U.S.) Geological Survey (USGS) quadrangle and in the Wooden Valley Creek Frontal Suisun Bay Estuaries (GPS Coordinates 38.23211, -122.11276).
Notice of Determination
Approving Agency
CA Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Solano
Final Environmental Document Available at
The Mitigated Negative Declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.