Proposed Seeley Water/Wastewater Master Plans
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003051152
- Lead Agency
- Seeley County Water District (SCWD)
- Document Title
- Proposed Seeley Water/Wastewater Master Plans
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 5/17/2005
- Present Land Use
- WIP & WIP sites; Zoning-PF (Public Facility); General Plan: Utility; Gov't/space. use. Pipeline routes: Roadway ROW.
- Document Description
- The project includes new water treatment package plants, backwash ponds, a new operations building, expansion of the raw water storage ponds, repairs to the water storage tanks and new distribution lines, valves and hydrants.
- Contact Information
-
Frank Conejo
California Department of Health Services
Lead/Public Agency
1350 Front Street, Room 2050
San Diego, CA 92101
Phone : (760) 356-3186
Location
- Counties
- Imperial
- Cross Streets
- New River Boulevard, Alamo Street
- Zip
- 92273
- Total Acres
- 2.11
- Parcel #
- 051-15003-43008
- State Highways
- I-8, S-80
- Railways
- SD&AE RR
- Airports
- El Centro Naval Aux. Air Station
- Schools
- Seeley Elem. School
- Waterways
- New River
- Township
- 15S
- Range
- 12E
- Section
- 66
- Base
- SBB&M
- Other Location Info
- City: Seeley
Notice of Determination
- Approving Agency
- California Department of Health Services
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- No
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.