Newport Trunk Sewer and Force Mains, Bitter Point Pump Station to Coast Trunk

5 Documents in Project

Summary

SCH Number
2003051126
Lead Agency
Orange County Sanitation District
Document Title
Newport Trunk Sewer and Force Mains, Bitter Point Pump Station to Coast Trunk
Document Type
NOD - Notice of Determination
Received
Posted
7/26/2007
Document Description
The Operator proposes to alter the stream by replacing the existing 8- and 12-inch gravity lines with two 36 inch High Density Poly Ethylene forced mains under the Santa Ana River. The forced mains will be installed within a 96-inch steel casing under the river using the micro-tunneling method. Open trench method will be used to install the forced mains from the Bitter Point Pump Station up to the east bank of the Santa Ana River. Open trenching will be conducted wtihin the existing 30-foot-easement along the raised service road that bisects the SAR Marsh from the oil fields to the bike path along the Santa Ana River.

Contact Information

Name
Erinn Wilson
Agency Name
Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach, Newport Beach
Counties
Orange
Cross Streets
Brookhurst
Zip
92708
Total Acres
110
State Highways
1 (Pacific Coast Highway)
Airports
John Wayne
Schools
John H. Eader Elementary
Waterways
Santa Ana River (SAR), SAR Panhandle, Pacific Ocean

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.