Hueneme Drain Pump Station Reconstruction Project

6 Documents in Project

Summary

SCH Number
2003051012
Lead Agency
Ventura County
Document Title
Hueneme Drain Pump Station Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
4/2/2004
Present Land Use
Open Space
Document Description
The project consists of improvements at the Hueneme Pump Station to provide the residents of Port Hueneme with flood protection from over bank flows of the Hueneme Drain. These improvements include replacing aging pumps and installing two hew pumps at the Pump Station, installing a portable emergency generator at the Pump Station to provide electrical service during power outages, improving trash-handling facilities by installing a traveling water screen, improving water quality to the Ormond Beach Lagoon by trapping trash, debris, sediment and oil prior to discharge, replacing the splash pas in the J Street Drain, and install an inflatable dam along the Hueneme Drain for use during routine maintenance.

Contact Information

Name
Betty Courtney
Agency Name
California Department of Fish and Game, Region 5-South
Contact Types
Lead/Public Agency

Location

Cities
Port Hueneme
Counties
Ventura
Cross Streets
Ocean View Drive and Surfside
Zip
93041
Total Acres
1.0
Parcel #
207026048
State Highways
1
Railways
V.C. Railroad
Airports
Port Hueneme Naval
Waterways
Pacific Ocean, J Street Drain, Ormond Beach Lagoon
Township
1N
Range
22W
Section
21,28

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print