Santa Ana River Reaches 1 & 2 Long-Term Maintenance; Issuance of Streambed Alteration Agreement No. 1600-2007-0199-R5

5 Documents in Project

Summary

SCH Number
2003044003
Lead Agency
United States Army, Army Corps of Engineers (USACE)
Document Title
Santa Ana River Reaches 1 & 2 Long-Term Maintenance; Issuance of Streambed Alteration Agreement No. 1600-2007-0199-R5
Document Type
NOD - Notice of Determination
Received
Posted
5/18/2011
Present Land Use
Flood Control Channel. Adjacent to River: Residential and Recreation
Document Description
Project will remove and maintain vegetation and debris within approximately 3.5 miles of the flood control channel within the Santa Ana River (Reaches 1 and 2). Maintenance includes excavation of sediment (to maintain design grade of the flood channel) with beach or near-shore disposal of suitable material at a frequency of approximately every 18 years. The actual frequency will vary depending on storm events and other factors that affect sediment deposition. Annual or routine maintenance includes temporary maintenance access, vegetation control (mower/dozer), inspections, and repair. Only native herbaceous wetland habitat (i.e., cattails and sedges) would be allowed to grow between annual maintenance periods.

Contact Information

Name
Marilyn Fluharty
Agency Name
DFG
Contact Types
Lead/Public Agency

Location

Cities
Huntington Beach
Counties
Orange
Cross Streets
Santa Ana River and Adams Ave. and PCH
Total Acres
+/-15
State Highways
405, PCH
Schools
Elem., HS
Waterways
Santa Ana River

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.