1200 El Camino Real-Service Stations
2 Documents in Project
Summary
SCH Number
2003042136
Lead Agency
City of Menlo Park
Document Title
1200 El Camino Real-Service Stations
Document Type
NOD - Notice of Determination
Received
Posted
8/27/2003
Present Land Use
C-4= General Commercial zoning district (Applicable to El Camino Real)
Document Description
The applicant has submitted a proposal to redevelop the existing Chevron Service Station at 1200 El Camino Real. The proposal would include the demoliton of all aboveground structures on the site, the retention of the existing underground fuel storage tanks, the reconstruction and expansion of the canopy and pump islands, and the reconstruction and expansion of the existing snack ship and auto service bays. The pump island canopy would expand from 1,164 square feet to 1,595 square feet, and the service station building would expand from 1,111 square feet to 2,194 square feet. Within the service station building, the snack shop would be expanded from 145 square feet to 418 square feet, and the auto service bays would be increased from 754 square feet to 1,296 square feet in order to expand the number of auto bays from two to three.
Contact Information
Name
Jeffery Smith
Agency Name
City of Menlo Park
Contact Types
Lead/Public Agency
Phone
Location
Cities
Menlo Park
Counties
San Mateo
Cross Streets
El Camino Real and Oar Grove Avenue
Zip
94025
Total Acres
0.25 acre
Parcel #
061-430-470
State Highways
82-84
Railways
Caltrain
Notice of Determination
Approving Agency
City of Menlo Park
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.