Ranch View Terrace Faculty and Staff Housing Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003042133
- Lead Agency
- University of California Santa Cruz
- Document Title
- Ranch View Terrace Faculty and Staff Housing Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/2/2004
- Present Land Use
- Public Facilities
- Document Description
- The project includes development of the Ranch View Terracy Faculty and Staff Housing project on 12.96 acres of the northern half of Inclusion Area D in the southern portion of the UCSC campus. The project site also includes two proposed access road alignments (1.56 acres), one to the east and one to the north; two proposed utility alignments sites (0.50 acres), one to the south along the eastern edge of Inclusion Area D and one to the southwest through the Arboretum eucalyptus grove; and realignment of the existing bicycle path that runs to the east of the main building site (0.18 acres). The total area of these components of the project is 15.2 acres.
- Contact Information
-
John Barnes
University of California
Lead/Public Agency
Planning Design and Construction 1111 Franklin Street, 6th Floor
Oakland, CA 94607-5200
Phone : (831) 459-2973
Location
- Cities
- Santa Cruz
- Counties
- Santa Cruz
- Cross Streets
- Bay Street/High Street
- Zip
- 95064
- Total Acres
- 2
- State Highways
- 1, 9, 17
- Schools
- UC Santa Cruz
- Township
- 11S
- Range
- 2W
- Section
- 10
- Base
- SC
Notice of Determination
- Approving Agency
- University of California
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 1156 High Street Santa Cruz, CA 96064
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.