Milligan Parking Lot Project Supplemental Environmental Impact Report

33 Documents in Project

Summary

SCH Number
2003042127
Lead Agency
City of San Jose
Document Title
Milligan Parking Lot Project Supplemental Environmental Impact Report
Document Type
NOD - Notice of Determination
Received
Posted
6/13/2024
Document Description
The Supplemental Environmental Impact Report for the Milligan Parking Lott Project considers a city project on an approximately 2.5-acre project site consisting of five parcels located in downtown San Jose. The site is occupied by an automobile repair shop with an attached warehouse, a vacant commercial building and additions, and a vacant single-family residential structure and garage. The project site currently contains 118 surface parking spaces used for SAP Center events. The City of San Jose, as the owner of the subject property, proposes to remove all existing on-site buildings and construct an approximately 300-space surface parking lot. The intent of the project is to provide a temporary surface parking lot during the construction activities occurring for the other projects in the vicinity. Driveways onto North Autumn Street and West St. John Street would provide ingress and egress to the proposed parking lot. Vehicles would access the site via two new 26-foot wide foll-access driveways. One driveway would be located on West St. John Street (160 feet east of North Autumn Street) and the second driveway would be located on North Autumn Street (approximately 240 north of West St. John Street). The project would remove 28 trees, including 20 ordinance-sized trees and plant 26, 24-inch-box replacement trees. A 600-foot-long future pedestrian trail or Class I paved bicycle and pedestrian trail would be constructed within the 35-foot setback area located between the proposed parking lot and the Guadalupe River. The trail would be approximately 12 feet wide, with two-foot-wide shoulders.

Contact Information

Name
Cassandra van der Zweep
Agency Name
City of San Jose, Department of Planning Building and Code Enforcement
Job Title
Planner IV
Contact Types
Lead/Public Agency

Name
Payman Ebrahimi
Agency Name
City of San Jose, Department of Public Works CFAS
Job Title
Associate Structure/Land Designer
Contact Types
Project Applicant

Name
Payman Ebrahimi
Agency Name
City of San Jose, Department of Public Works CFAS
Job Title
Associate Structure/Land Designer
Contact Types
Project Applicant

Location

Cities
San Jose
Counties
Santa Clara
Regions
Citywide
Cross Streets
West St John and N Autumn Street
Zip
95113
Total Acres
2.5
Parcel #
259-29-032, 259-29-033, 259-29-071, 259-29-072, 259-29-10
State Highways
CA-87, I-880, I-280
Railways
Caltrain, Amtrack, ACE, VTA ligh
Airports
Norman Mineta San Jose Int'l
Schools
St Leo the Great School
Waterways
Guadalupe River

Notice of Determination

Approving Agency
City of San Jose
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
City of San Jose, Planning Building and Code Enforcement, 200 E. Santa Clara Street, 3rd Floor Tower, San Jose, CA 95113

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print