Terraine Mixed-Use Project
33 Documents in Project
Summary
SCH Number
2003042127
Lead Agency
City of San Jose
Document Title
Terraine Mixed-Use Project
Document Type
NOD - Notice of Determination
Received
Posted
4/4/2024
Document Description
The project consists of a Special Use Permit to develop an approximately 1.57-acre vacant lot over two phases. Phase I of the project would consist of the construction of a 17-story, 345-unit residential tower and a nine-level parking tower on a shared podium. The podium would cover the entire site and would include one below-grade level and one at-grade level of parking. The below-grade level would have a depth of approximately 20 feet. The podium would contain parking for vehicles and bicycles, loading areas, mechanical rooms, and lobbies. The podium would also include up to 11,777 square feet of ground floor retail space. A landscaped/open space area would be located between the residential tower and parking tower and on the ground floor of the podium. Phase II of the project would consist of the conversion of the parking tower into an office building with approximately 210,328 square feet of office space.
Contact Information
Name
Nhu Nguyen
Agency Name
City of San Jose
Job Title
Planner I
Contact Types
Lead/Public Agency
Phone
Email
Name
Hunter Lien
Agency Name
Westbank Corp
Job Title
Real Estate Developer
Contact Types
Project Applicant
Phone
Email
Location
Cities
San Jose
Counties
Santa Clara
Regions
Citywide
Parcel #
259-24-020, 259-24-040, and 259-24-041
Notice of Determination
Approving Agency
City of San Jose
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Clara
Final Environmental Document Available at
200 East Santa Clara Street, 3rd Floor Tower, San José CA 95113-1905
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to the Downtown Strategy 2040 Final EIR)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Draft Environmental Document [Draft IS, NOI_NOA_Public notices, OPR Summary Form, Appx,]
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.