Primary Road Improvements

10 Documents in Project

Summary

SCH Number
2003042080
Lead Agency
California Department of Parks and Recreation
Document Title
Primary Road Improvements
Document Type
NOD - Notice of Determination
Received
Posted
10/24/2007
Present Land Use
Forest Recreation District with a Protected Area-Park and Recreation (Contra Costa General Plan) / Cultural Preserve (St. Pk GP)
Document Description
Make high priority improvements to the primary road system that serves Mt. Diablo State Park. Improve the safety of the road conditions for motor vehicles and bicyclists and prevent further erosion and degradation of the existing road system. The following work will take place on South Gate Road: - Repair/improve/upgrade a total of 46 pipe culverts along this road. - Reconstruct or stabilize approximately 7,000 linear feet of road base structural sections with reinforcing geotextile fabric; install a subdrainage system to divert water away from the road section prism. - Place a new road surface with an asphalt concrete overlay the entire length of Southgate Road, a distance of approximately 5.7 miles.

Contact Information

Name
Gail Sevrens
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Cities
Clayton, Danville
Counties
Contra Costa
Cross Streets
South Gate Road, Diablo Road, North Gate Road, Summit Road
Zip
94526
Parcel #
Mt. Diablo State Park
State Highways
680
Schools
Athenian
Waterways
Sycamore Creek
Township
1S
Range
1W
Section
1,11,
Base
MDB&M
Other Information
Section: 12-14, 23

Notice of Determination

Approving Agency
Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.