Rock City Day Use Area Rehabilitation Project

2 Documents in Project

Summary

SCH Number
2003042061
Lead Agency
California Department of Parks and Recreation
Document Title
Rock City Day Use Area Rehabilitation Project
Document Type
NOD - Notice of Determination
Received
Posted
5/14/2003
Present Land Use
Cultural Preserve-Mt. Diablo State Park General Plan; Forest Recreation District (F-R); Park and Recreation designation- Contra Costa General Plan (July 1996)
Document Description
Install vehicular barriers to prevent encroachment into natural areas. Consolidate trails to reduce compaction in natural areas and improve accessibility. Restore eroded areas around picnic sites. Repair CCC site furniture following Secretary of the Interior Standards. Revegetate eroded areas or areas disturbed by construction. Grade site for construction of future comfort station (reviewed and approved as separate project, per Notice of Exemption, SCH #2001088271 filed on 8/17/2001). Remove unsafe informal parking along Southgate Road. Grade and pave one small parking along Southgate Road. Grade and pave one small parking lot to replace informal parking. Correct drainage failures that have caused erosion. Repave disintegrated roadways. Install regulatory signage. Install regulatory signage. Install accessible picnic tables and grills. Install interpretive signage discussing sensitive resources. Recognize, re-grade and pave existing parking areas. Remove unnecessary paving. Relocate several vehicular gates.

Contact Information

Name
Shaelyn Raab Strattan
Agency Name
Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Cities
Clayton
Counties
Contra Costa
Cross Streets
South Gate Road/ Mt. Diablo Scenic Drive
State Highways
101
Waterways
Sycamore Creek

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes