Santa Rosa Creek Road at Curti Creek Replacement and Shoulder Repair Project;

3 Documents in Project

Summary

SCH Number
2003041177
Lead Agency
San Luis Obispo County
Document Title
Santa Rosa Creek Road at Curti Creek Replacement and Shoulder Repair Project;
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2003
Present Land Use
Grazing/Agriculture/Agriculture
Document Description
The County Public Work Department is proposing to replace the two existing nine-foot diameter culverts that cross under Santa Rosa Creek Road at Curti Creek, a tributary of Santa Rosa Creek. The culverts exhibit extensive corrosion and erosion has exposed the outlet ends of the culverts claiming the road shoulder and a portion of the roadway itself. The project involves the cut/removal of overlaying asphalt-concrete pavement; removal of the existing culverts; over excavation of the base of the slope; backfilling with sandy gravel or native soil; keying in and rebuilding the slope and road shoulder with 1 to 4 ton rock or gabion wire baskets; installation of new culverts; placing soil fill in/around culverts and rock and revegetation with live willow cuttings at 3 feet on center.

Contact Information

Name
John Farhar
Agency Name
San Luis Obispo County
Contact Types
Lead/Public Agency

Location

Cities
Cambria
Counties
San Luis Obispo
Cross Streets
Santa Rosa Creek Road and Curti Creek Road
Total Acres
.11
Waterways
Curti Creek, Santa Rosa Creek
Township
27S
Range
9E
Section
21
Base
MDBM

Notice of Determination

Approving Agency
San Luis Obispo County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No