Mission Springs Water District 900 Zone Project
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003041165
- Lead Agency
- Mission Springs Water District
- Document Title
- Mission Springs Water District 900 Zone Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/22/2004
- Present Land Use
- Industrial
- Document Description
- The proposed project calls for the construction of a new 2000 gpm groundwater production well, two 2.0 MG water storage reservoirs area, a booster pump station, and two distribution pipelines to deliver the water supply from the new reservoirs to customers in the 900 and 1,070-foot services zones. The storage reservoirs would be constructed on a District-owned parcel measuring 670' x 320' (about 5 acres). The District proposes to construct only one of the two storage tanks at this time. The second tank would be constructed at a future date when needed to meet increased water demands.
- Contact Information
-
Gary Brockman / Fred Adjarian
Mission Springs Water District
Lead/Public Agency
66575 Second Street
Desert Hot Springs, CA 92240
Phone : 760-329-6448 x120 / x 119
Location
- Cities
- Desert Hot Springs
- Counties
- Riverside
- Cross Streets
- Little Morongo and Dillon
- Zip
- 92240
- Total Acres
- ~6
- Parcel #
- Varied
- State Highways
- I-10
- Waterways
- Mission Creek
- Township
- 3S
- Range
- 4E
- Section
- 1,2...
- Other Information
- 11,12,13&14
Notice of Determination
- Approving Agency
- Mission Springs Water District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Mission Springs Water District 66575 Second Street Desert Hot Springs, CA 92240
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.